The design of this heating installation is based on the greenhouse surface area of 8.672 m² .

This greenhouse project consists of a total of 4 climate zones. In the greenhouse each climate zone is provided with a table heating and upper heating system with gable heating system behind the outside gables. The monorail pipe and tube rail heating system is divided in 4 separate controlled sections

system.  Furthermore the boiler installation will consist of 1 boiler make: Crone, type: CLM 115, with a capacity of 3600 kW with a Vitotherm burner and gasline, as well as a partial flow filter. The piping in the boiler room and all mixing groups will be insulated.

Start: August 2015

Brushco Farms

Brush CO

USA

The renovation of the existing transport lines, transport groups and mixing groups including insulation and electrical work.

Start: August/September 2015

Total surface area: 22.5 ha.

Surface new construction: 3 ha.

Crop:  tomatoes

After installing the heating installation of the 2nd phase in 2013, JV Energy Solutions has installed another 3 ha. of tuberail heating, CO-2 installation, Lighting (3 + 7,5 ha.), low and medium voltage installation as well as a CHP installation JMS 616 (2,4 MW).

CO2 installation

The 5 phases in the greenhouse will be provided with 4 hoses Ø 60 mm per trellis of 24’. For the dosing of the CO₂ we supply and install 1 CO2-fan, of the make Van Dijk, with an electrical servo of 37 kW.

The Co2 fan is placed on a galvanized bracket and connected to the existing aluminum flue gas chimney. The CO₂-fan will be equipped with a frequency driver.

The delivery and installation of 2 new Crone CLW 115 boilers

2 Boiler condenser installation incl. 2 Gas burner installations, as well as a gas pipeline incl. gas regulator. The new piping will be insulated. Finally we will install a Sotex expansion