The renovation of the existing transport lines, transport groups and mixing groups including insulation and electrical work.
Start: September/October 2015
The renovation of the existing transport lines, transport groups and mixing groups including insulation and electrical work.
The delivery and installation of two boilers 9,6 MW including insulation, warm water softener and partial flow filter.
Start: September/October 2015
The design of this heating installation is based on the greenhouse surface area of 8.672 m² .
This greenhouse project consists of a total of 4 climate zones. In the greenhouse each climate zone is provided with a table heating and upper heating system with gable heating system behind the outside gables. The monorail pipe and tube rail heating system is divided in 4 separate controlled sections
system. Furthermore the boiler installation will consist of 1 boiler make: Crone, type: CLM 115, with a capacity of 3600 kW with a Vitotherm burner and gasline, as well as a partial flow filter. The piping in the boiler room and all mixing groups will be insulated.
Start: August 2015
Brushco Farms
Brush CO
USA
The renovation of the existing transport lines, transport groups and mixing groups including insulation and electrical work.
Start: August/September 2015
Total surface area: 22.5 ha.
Surface new construction: 3 ha.
Crop: tomatoes
After installing the heating installation of the 2nd phase in 2013, JV Energy Solutions has installed another 3 ha. of tuberail heating, CO-2 installation, Lighting (3 + 7,5 ha.), low and medium voltage installation as well as a CHP installation JMS 616 (2,4 MW).