Total surface area: 22.5 ha.
Surface new construction: 3 ha.
Crop: tomatoes
After installing the heating installation of the 2nd phase in 2013, JV Energy Solutions has installed another 3 ha. of tuberail heating, CO-2 installation, Lighting (3 + 7,5 ha.), low and medium voltage installation as well as a CHP installation JMS 616 (2,4 MW).