Installation of a CHP in the existing boiler room, including the installation of the HT drycooler, LT drycooler CHP, delivery and installation of the low pressure gasline, installation of the gascompressor and insulation of piping.
The design of the heating installation is based on the greenhouse surface area of 7.872 m². The greenhouse expansion consists of 3 climate zones with a central walk way and at both sides a gable end wall path. One climate zone is provided with a floor heating, hoist heating and upper heating. The other two climate zones are provided with a table heating, hoist heating and upper heating.
We deliver and install 1 traditional 3 pass boiler, make: Crone, includeing a Zantinhg gasburner.
The heating installation consist of a high temperature transport line circuit from the existing manifold to the new greenhouse.
The greenhouse heating installation consists of:
Start: week 44
The renovation of the existing transport lines, transport groups and mixing groups including insulation and electrical work.
Start: September/October 2015
The renovation of the existing transport lines, transport groups and mixing groups including insulation and electrical work.
The delivery and installation of two boilers 9,6 MW including insulation, warm water softener and partial flow filter.
Start: September/October 2015