Hydropothecary Phase 2
Gatineau, Québec

The design of the heating installation is based on the greenhouse surface area of 72.000 m². The greenhouse expansion consists of 16 climate zones. Each climate zone is provided with a tuberail, grow tube and gable heating. The greenhouse consists of 4 climate zones for the snow heating.

We deliver and install 3 traditional 3 pass boiler, make: Crone, 1 heat storage tank 4.000 m³ including a nitrogen expansion system.

We will build a manifold Ø 610 suitable for the complete project. On this manifold we’ll build 3 transportation line pump groups, 1 connection for irrigation heating, 1 connection for irrigation heat exchanger, 1 connection for air heaters, 1 connection for corridor heating, 2 spare connections DN150. The manifold will be high mounted.

The greenhouse is provided with a CO₂ dosing installation connected to the flue gas condensers of the gas fired boiler in the boiler room.

Cooling installation

We will deliver and install 7 chillers outside the technical room. In the technical room a manifold will be delivered and placed for 4 zones. In the greenhouse 160 cool units will be installed.

The heating and cooling installation will be insulated.


Update March 2019 Fase 2

Oktober 2018 Fase 2

Hydropothecary
Gatineau, Québec

The design of the heating installation is based on the greenhouse surface area of 19.656 m². The greenhouse expansion consists of 8 climate zones with a central corridor. Each climate zone is provided with a upper, floor and hoist heating. The greenhouse consists of 2 climate zone for the snow heating.

We deliver and install 2 traditional 3 pass boiler, make: Crone including a nitrogen expansion system.

We will build a 4,5 MW manifold suitable for the complete project. On this manifold we’ll build 1 transportation line pump, 2 snow pipe heating groups, 1 packing hall group and 1 spare connection.

The new greenhouse project consists of a total of 8 climate zones with a central walk way

In the greenhouse each climate zone is provided with a snow heating, upper heating, hoist heating, floor heating and gable heating system. Also the greenhouse is provided with a CO₂ dosing installation connected to the flue gas condenser of the gas fired boiler in the boiler room.

Cooling installation

We will deliver and install 2 chillers outside the technical room. In the technical room a manifold will be delivered and placed for 8 zones. In the greenhouse 36 cool units will be installed.

The heating and cooling installation will be insulated.


Update Oktober 2018 Fase 1


Januari 2018

 

The design of the heating installation is based on the greenhouse surface area of 61.438,5 m².

We deliver and install 1 traditional 3 pass boiler, make: Crone and 2 2000 m³ hot water storage tank including nitrogen expansion system. Furthermore we will install 2 biomass boilers with a capacity of 8.000 kW.

The boiler room is prepared with a manifold and spare connections for the new phases 2 & 3. The new greenhouse project consists of a total of 6 climate zones with a central walk way and a R&D department. In the greenhouse each climate zone is provided with a tube rail with gable heating system behind the outside gables. The greenhouse heating installation consists of:

Tube rail heating (10 x Ø51x2,4 mm) Grow tube heating (5x Ø51x2,4 mm) and a gutter heating (4 white powder coated tubes Ø35x1,2 mm per 9 meter trellis and gable heating.

Also the greenhouse is provided with a CO₂ dosing installation connected to the flue gas condenser of the gas fired boiler in the boiler room.


Aphria - EPS/AB
Leamington, Ontario

Installation of 8 CHP’s including the installation of the HT drycooler, LT drycooler CHP, installation of the gas compressor and insulation of piping.


Update March 2019

Update Oktober 2018

April 2018

 

 

E-Nature
Hamilton, Ontario

Installation of 2 CHP’s (Ecomax JMS620) including the installation of the HT drycooler, LT drycooler CHP, installation of the gas compressor and insulation of piping.