Hydropothecary Fase 2 - Gatineau, Québec

Hydropothecary Phase 2
Gatineau, Québec

The design of the heating installation is based on the greenhouse surface area of 72.000 m². The greenhouse expansion consists of 16 climate zones. Each climate zone is provided with a tuberail, grow tube and gable heating. The greenhouse consists of 4 climate zones for the snow heating.

We deliver and install 3 traditional 3 pass boiler, make: Crone, 1 heat storage tank 4.000 m³ including a nitrogen expansion system.

We will build a manifold Ø 610 suitable for the complete project. On this manifold we’ll build 3 transportation line pump groups, 1 connection for irrigation heating, 1 connection for irrigation heat exchanger, 1 connection for air heaters, 1 connection for corridor heating, 2 spare connections DN150. The manifold will be high mounted.

The greenhouse is provided with a CO₂ dosing installation connected to the flue gas condensers of the gas fired boiler in the boiler room.

Cooling installation

We will deliver and install 7 chillers outside the technical room. In the technical room a manifold will be delivered and placed for 4 zones. In the greenhouse 160 cool units will be installed.

The heating and cooling installation will be insulated.


Update March 2019 Fase 2

  • PHOTO-2019-01-22-13-46-14 1
  • PHOTO-2019-02-22-19-51-40
  • PHOTO-2019-02-22-19-51-41
  • PHOTO-2019-02-22-19-51-411
  • PHOTO-2019-03-11-12-34-45
  • PHOTO-2019-03-11-12-35-12
  • VYvs-2aI_jpeg
  • HEgZ7_DM_jpeg
  • PHOTO-2018-12-08-17-35-30
  • PHOTO-2018-12-08-17-35-31

Oktober 2018 Fase 2

  • IMG_3013a
  • 20180913_074843_resized
  • Hydropothecary II - Boilers
  • IMG_4043
  • IMG_5064
  • PHOTO-2018-07-26-09-18-42
  • IMG_3012a
  • IMG_3011a
  • IMG_3010a

Hydropothecary Fase 1 - Gatineau, Québec

Hydropothecary
Gatineau, Québec

The design of the heating installation is based on the greenhouse surface area of 19.656 m². The greenhouse expansion consists of 8 climate zones with a central corridor. Each climate zone is provided with a upper, floor and hoist heating. The greenhouse consists of 2 climate zone for the snow heating.

We deliver and install 2 traditional 3 pass boiler, make: Crone including a nitrogen expansion system.

We will build a 4,5 MW manifold suitable for the complete project. On this manifold we’ll build 1 transportation line pump, 2 snow pipe heating groups, 1 packing hall group and 1 spare connection.

The new greenhouse project consists of a total of 8 climate zones with a central walk way

In the greenhouse each climate zone is provided with a snow heating, upper heating, hoist heating, floor heating and gable heating system. Also the greenhouse is provided with a CO₂ dosing installation connected to the flue gas condenser of the gas fired boiler in the boiler room.

Cooling installation

We will deliver and install 2 chillers outside the technical room. In the technical room a manifold will be delivered and placed for 8 zones. In the greenhouse 36 cool units will be installed.

The heating and cooling installation will be insulated.


Update Oktober 2018 Fase 1

  • PHOTO-2018-06-19-18-18-58
  • Chiller ingepakt met gaasdoek
  • PHOTO-2018-05-18-18-01-48
  • PHOTO-2018-05-18-18-01-49
  • PHOTO-2018-05-18-18-01-50
  • PHOTO-2018-05-18-18-01-441
  • PHOTO-2018-06-01-17-30-46
  • PHOTO-2018-06-13-19-35-44
  • PHOTO-2018-06-19-18-18-16


Januari 2018

  • hydropothecary1
  • hydropothecary2
  • hydropothecary3
  • hydropothecary4
  • 2018-03-27-PHOTO-00000025
  • 2018-03-27-PHOTO-00000029
  • 2018-03-27-PHOTO-00000030
  • 2018-03-27-PHOTO-00000031

 

Sagami - Mirabel, Québec

The design of the heating installation is based on the greenhouse surface area of 61.438,5 m².

We deliver and install 1 traditional 3 pass boiler, make: Crone and 2 2000 m³ hot water storage tank including nitrogen expansion system. Furthermore we will install 2 biomass boilers with a capacity of 8.000 kW.

The boiler room is prepared with a manifold and spare connections for the new phases 2 & 3. The new greenhouse project consists of a total of 6 climate zones with a central walk way and a R&D department. In the greenhouse each climate zone is provided with a tube rail with gable heating system behind the outside gables. The greenhouse heating installation consists of:

Tube rail heating (10 x Ø51x2,4 mm) Grow tube heating (5x Ø51x2,4 mm) and a gutter heating (4 white powder coated tubes Ø35x1,2 mm per 9 meter trellis and gable heating.

Also the greenhouse is provided with a CO₂ dosing installation connected to the flue gas condenser of the gas fired boiler in the boiler room.


  • sagami1
  • sagami2
  • sagami3
  • sagami4
  • sagami5
  • sagami6
  • PHOTO-2018-10-16-21-03-391
  • PHOTO-2018-10-16-21-03-403
  • PHOTO-2018-10-16-21-03-413

Aphria - EPS/AB Leamington, Ontario

Aphria - EPS/AB
Leamington, Ontario

Installation of 8 CHP’s including the installation of the HT drycooler, LT drycooler CHP, installation of the gas compressor and insulation of piping.


Update March 2019

  • WhatsApp Image 2018-05-11 at 7.32.44 PM(1)
  • WhatsApp Image 2018-05-11 at 7.39.31 PM(2)
  • WhatsApp Image 2018-09-20 at 10.32.15 AM(1)
  • PHOTO-2019-02-20-21-18-38
  • PHOTO-2019-02-20-21-18-372

Update Oktober 2018

  • PHOTO-2018-06-19-18-46-38
  • PHOTO-2018-04-17-17-40-21
  • PHOTO-2018-05-12-01-32-44
  • PHOTO-2018-06-19-18-46-40

April 2018

  • 2017-12-05-PHOTO-00001045
  • 2017-12-06-PHOTO-00001051
  • 2018-03-01-PHOTO-00001122
  • 2018-03-06-PHOTO-00001131
  • 2018-03-14-PHOTO-00001133
  • 2018-03-23-PHOTO-00001141

 

 

E-Nature - Hamilton, Ontario

E-Nature
Hamilton, Ontario

Installation of 2 CHP’s (Ecomax JMS620) including the installation of the HT drycooler, LT drycooler CHP, installation of the gas compressor and insulation of piping.


March 2019

  • PHOTO-2019-03-22-18-10-42
  • PHOTO-2019-03-22-18-10-141
  • PHOTO-2019-03-22-18-10-281
  • PHOTO-2019-04-10-13-26-41
  • PHOTO-2019-04-10-15-39-35
  • PHOTO-2019-04-10-15-39-36
  • PHOTO-2019-04-10-15-39-37
  • PHOTO-2019-04-10-15-39-38
  • PHOTO-2019-04-10-15-39-351
  • PHOTO-2019-04-10-15-39-361
  • PHOTO-2019-03-22-18-10-37

 

 

  1. Medisun - Grande Pointe, Ontario
  2. Truly Green Farms Chatham, Ontario

Page 2 of 3

  • 1
  • 2
  • 3

Our location

JV Energy Solutions Inc.
80 Wigle Ave
Kingsville, N9Y 2J8
Ontario, Canada

Contact

Phone: 1 519 962 9116
Fax: 1 519 962 8580
info@jvenergysolutions.com
sales@jvenergysolutions.com

Terms of conditions

Terms of conditions EN

Disclaimer