Leamington, Ontario, Canada
Complete Climate Control System
Size: 37 Acres of Greenhouse Facility.
Complete heating & cooling installation in a fresh structure, including grow tubes, CO2 management, boilers, burners, boiler room, heat storage tanks and more.
State of the art, cold water-cooling system, designed and engineered to provide steady temperature maintenance with industry leading noise reduction technology. New chiller, ground cooling lines, above ground mounted cold water chiller units.
Additionally, we integrated the climate system into a 4.5 acre packing warehouse, maintaining adequate climate for the produce.
All working together, so the crops in the greenhouse can thrive, and then after the harvest, the produce can be kept at peak freshness during the packing process.
In addition to climate control in the greenhouses, JV Energy is also well-versed in the heating & cooling, and utility set up for Bunkhouses. Ensuring comfortable living spaces for workers who reside on-site in the greenhouse industry.








