Delivery and installation of a vertical hot water storage tank with a capacity of 2.250 m³ and a cylindrical height of 17 meter. For the expansion of the water in the heat storage tanks we supply and install a nitrogen generator expansion system. 

For the connection from the tank to the boiler room we high mounted steel piping on a galvanized frame work. Two high temperature transport line circuits will be mounted  from the CHP to the manifold in the boiler-room

The storage tank and all piping of the transport lines will be insulated.