Release your Energy

heating

Heating

Correct temperature control is essential for our customers. That may involve cooling and/or heating, and may or may not be combined with other forms of air-conditioning


 Read more

insulation

Insulation

Cost-saving, comfort and - more sector specific - increased cultivation results are the most important reasons for insulation.


Read more

utilities

Commercial buildings

As an all-round installation firm we can use our specialties very well for designing and installing utilities.


Read more

Service & Maintenance

JV Energy Solutions - your reliable partner for service and maintenance.

 


Read more

Platinum Produce

21037 Communication Road

Blenheim, NOP 1A0 Ontario


The design of the heating installation is based on the greenhouse surface area of phase 2 79.120 m².

During phase 1, we already designed the boiler room installation for phase 2.

Phase 2 of the greenhouse project consists of a total of 9 climate zones (propagation and production areas) with a central walk way. In the greenhouse each production climate zone is provided with a tube rail system with gable heating system behind the outside gables and the grow pipe heating system is divided in 4 separate controlled sections. The propagation area is provided with a floor heating, lift heating and upper heating. Also the greenhouse is provided with a CO₂ dosing installation connected to the flue gas condensers of the gas fired boilers in the boiler room.

Start: week 30

recent work jv energy solutions

Projects 2020

 

  • Ontario Plant Propagation Phase 3, St. Thomas, Ontario
  • Twin Creeks Phase 3 & 4, Watford Ontario
  • Twin Creeks, Watford Ontario Packing Hall
  • Foliera, Beamsville Ontario, Renovation
  • Red Sun, Kingsville Ontario
  • Pure Flavor, Kingsville Ontario
  • JEM Farms, Kingsville Ontario tomatoes
  • EPS/AB Elliot, Leamington, Ontario
  • EPS/AB Undersun acres, Leamington
  • EPS/AB Cedarline, Chatham
  • Cosmic Plants cooling, Beamsville Ontario

 

 

Read more