Release your Energy

heating

Heating

Correct temperature control is essential for our customers. That may involve cooling and/or heating, and may or may not be combined with other forms of air-conditioning


 Read more

insulation

Insulation

Cost-saving, comfort and - more sector specific - increased cultivation results are the most important reasons for insulation.


Read more

utilities

Commercial buildings

As an all-round installation firm we can use our specialties very well for designing and installing utilities.


Read more

Service & Maintenance

JV Energy Solutions - your reliable partner for service and maintenance.

 


Read more

Canada: JV Energy now offering emergency and maintenance service

The most important part of running a greenhouse business is the fact that it needs to go on 24/7. Problems and errors in your system can occur, but in most cases it is needed to get things repaired and fixed as soon as possible. The team at JV Energy is aware of this, and that is why they now offer a special emergency and maintenance service in the Kingsville/Leamington Area.



"We believe service is the most important aspect we can offer our clients", said Anneke Scholtes of JV Energy. She explained that they have experienced specialists on board to repair or overhaul pumps. "Our service technicians have been trained by various reputable companies in The Netherlands, and can solve most any problem right on site.  And if not, it can be repaired or overhauled in our shop which is equipped with all the necessary technical equipment to do so. "

As well as this, JV Energy also carry the most common spare parts in stock, so that downtime for growers is reduced to a minimum. JV Energy is not only the place for maintenance and repairs of your pumps, but also for expansion installations, Berkvens carts and for purchasing a wide variety of materials including brands such as Honeywell/Centra, AFA and Johnson/SPX.

"Our service engineers offer 24-hour emergency service and our warehouse is stocked with replacement parts and motors to get your installation up and running quickly again".

 

Proplant Propagation

2401 Hwy 6 South

Jarvis  ON,  N0A 1J0

 

The design of the heating installation is based on the greenhouse surface area of phase 2: 19.136 m². with a service area with a surface area of 995,2 m²

Phase 2 of the greenhouse project consists of a total of 4 climate zones with a central walk way. In the greenhouse each climate zone is provided with a floor heating, hoist heating and upper heating with gable heating system behind the outside gables.

Start: week 18 2016

 

Cornelissen Farms Inc.

8861 Zion Line

Watford, Ontario

 

The design of the heating installation is mostly based on the greenhouse surface area of four production phases each with a surface of 42.228 m².

 

The manifold and transport lines are prepared for four phases. The heat storage tank is prepared for two phases. The greenhouse project phase 1 consists a total of 4 climate zones with a central walk way and corridor. In the greenhouse, each climate zone is provided with a tube rail and gable heating system behind the outside gables. The grow pipe heating system is divided in 2 separate controlled sections. Phase 1 is also provided with a CO₂ dosing installation connected to the flue gas condenser of the gas fired boiler in the boiler room.

 

Start:  week 32

Platinum Produce

21037 Communication Road

Blenheim, NOP 1A0 Ontario


The design of the heating installation is based on the greenhouse surface area of phase 2 79.120 m².

During phase 1, we already designed the boiler room installation for phase 2.

Phase 2 of the greenhouse project consists of a total of 9 climate zones (propagation and production areas) with a central walk way. In the greenhouse each production climate zone is provided with a tube rail system with gable heating system behind the outside gables and the grow pipe heating system is divided in 4 separate controlled sections. The propagation area is provided with a floor heating, lift heating and upper heating. Also the greenhouse is provided with a CO₂ dosing installation connected to the flue gas condensers of the gas fired boilers in the boiler room.

Start: week 30

Project: Intergrow Greenhouses Inc.
Plaats: Albion, New York
Total surface area: 22,5 ha.
Surface new construction: 3 ha.
Crop:  tomatoes

Activities

Activities JV Energy/Voshol Warmte-Elektrotechniek

  • Heating installation
  • CO-2 installation
  • Lighting (3 + 7,5 ha.)
  • low and medium voltage installation
  • CHP installation JMS 616 (2,4 MW)

recent work jv energy solutions

Projects 2020

 

  • Ontario Plant Propagation Phase 3, St. Thomas, Ontario
  • Twin Creeks Phase 3 & 4, Watford Ontario
  • Twin Creeks, Watford Ontario Packing Hall
  • Foliera, Beamsville Ontario, Renovation
  • Red Sun, Kingsville Ontario
  • Pure Flavor, Kingsville Ontario
  • JEM Farms, Kingsville Ontario tomatoes
  • EPS/AB Elliot, Leamington, Ontario
  • EPS/AB Undersun acres, Leamington
  • EPS/AB Cedarline, Chatham
  • Cosmic Plants cooling, Beamsville Ontario

 

 

Read more