Release your Energy

heating

Heating

Correct temperature control is essential for our customers. That may involve cooling and/or heating, and may or may not be combined with other forms of air-conditioning


 Read more

insulation

Insulation

Cost-saving, comfort and - more sector specific - increased cultivation results are the most important reasons for insulation.


Read more

utilities

Commercial buildings

As an all-round installation firm we can use our specialties very well for designing and installing utilities.


Read more

Service & Maintenance

JV Energy Solutions - your reliable partner for service and maintenance.

 


Read more

 

Cornelissen Farms Inc.

8861 Zion Line

Watford, Ontario

 

The design of the heating installation is mostly based on the greenhouse surface area of four production phases each with a surface of 42.228 m².

 

The manifold and transport lines are prepared for four phases. The heat storage tank is prepared for two phases. The greenhouse project phase 1 consists a total of 4 climate zones with a central walk way and corridor. In the greenhouse, each climate zone is provided with a tube rail and gable heating system behind the outside gables. The grow pipe heating system is divided in 2 separate controlled sections. Phase 1 is also provided with a CO₂ dosing installation connected to the flue gas condenser of the gas fired boiler in the boiler room.

 

Start:  week 32

recent work jv energy solutions

Projects 2020

 

  • Ontario Plant Propagation Phase 3, St. Thomas, Ontario
  • Twin Creeks Phase 3 & 4, Watford Ontario
  • Twin Creeks, Watford Ontario Packing Hall
  • Foliera, Beamsville Ontario, Renovation
  • Red Sun, Kingsville Ontario
  • Pure Flavor, Kingsville Ontario
  • JEM Farms, Kingsville Ontario tomatoes
  • EPS/AB Elliot, Leamington, Ontario
  • EPS/AB Undersun acres, Leamington
  • EPS/AB Cedarline, Chatham
  • Cosmic Plants cooling, Beamsville Ontario

 

 

Read more