Cornelissen Farms Inc.
8861 Zion Line
Watford, Ontario
The design of the heating installation is mostly based on the greenhouse surface area of four production phases each with a surface of 42.228 m².
The manifold and transport lines are prepared for four phases. The heat storage tank is prepared for two phases. The greenhouse project phase 1 consists a total of 4 climate zones with a central walk way and corridor. In the greenhouse, each climate zone is provided with a tube rail and gable heating system behind the outside gables. The grow pipe heating system is divided in 2 separate controlled sections. Phase 1 is also provided with a CO₂ dosing installation connected to the flue gas condenser of the gas fired boiler in the boiler room.
Start: week 32
|
|